Fuel Injection Pump INSTALLATION

NOTE: Make sure that cylinder #1 is positioned at top dead center of compression stroke before installing the injection pump.

1. Slowly rotate the engine, with the barring tool, while pushing in on the timing pin. The pin will fall into a hole in the cam gear when the engine reaches Top Dead Center (TDC) of the compression stroke of #1 cylinder. Stop rotating the engine once the timing pin drops into the cam gear.
2. Pull the timing pin out of the camshaft gear.
3. Install a new injection pump gasket.

NOTE: The shaft of the new injection pump should be locked into place so that its key-way is positioned to align with the drive gear slot when the engine is at TDC of compression stroke of #1 cylinder. CAUTION: Make sure the injection pump key doesn't fall into the gear housing, because the gear cover would have to be removed to retrieve it before starting the engine.

4. Install the injection pump and tighten the mounting nuts finger tight. Make sure that the injection pump can slide in the mounting slots.
5. Remove the T-bar from the injection pump drive gear.
6. Install the injection pump drive shaft spring washer and retaining nut, and torque the retaining nut to 11 to 15 lb-ft (15 to 20 Nm). CAUTION:Do not overtighten. This is not the final torque for the retaining nut.
7. If installing a new or rebuilt injection pump without a timing mark, take up gear lash by rotating the pump housing counterclockwise towards the cylinder head. Ifinstalling original injection pump, rotate the injection pump housing until the timing marks align.
8. Torque the mounting nuts to 18 lb-ft (24 Nm).
9. If a rebuilt or new injection pump was installed, mark the injection pump flange in line with the mark on the gear housing.
10. Loosen the injection pump lockscrew and install the washer that was wire tagged to the injection pump. Torque the lockscrew to 10 lb-ft (13 Nm).
11. Install the injection pump support bracket and tighten the bolts finger tight. Torque the bolts to 18 lb-ft (24 Nm) using the following sequence:
• Tighten support bracket to engine block bolts.
• Tighten support bracket to injection pump bolts.
• Tighten throttle support bracket mounting bolts.
12. Torque injection pump drive gear retaining nut to 48 lb-ft (65 Nm).
13. Install oil filler assembly to gear housing. Torque clamp screw to 32 lb-ft (43 Nm).
14. Time the injection pump. See: Adjustments\Fuel Injection Pump Timing Install high pressure supply lines. See: Fuel Supply Line\Service and Repair\High Pressure Lines - Replacement
15. Install injection pump supply line. Torque supply line connections to 24 lb-ft (24 Nm).
16. Connect solenoid electrical connector to fuel solenoid.
17. Install fuel pump vent line and capscrew.
18. Install air fuel control tube.
19. Install throttle bracket and torque mounting bolts to 18 lb-ft (24 Nm).
20. Install throttle linkage. When connecting the cable to the control lever, adjust the length so the lever has stop-to-stop movement. Adjust if necessary.
21. Bleed fuel system.
22. Adjust low idle speed if necessary.
23. Inspect throttle linkage to ensure that the control lever breaks over the full throttle position. Adjust if necessary.
24. Connect negative battery terminal to battery.